ANKENY CITY COUNCIL

Regular Agenda

April 15, 2019
5 : 30 PM

Gary Lorenz, Mayor
Mark Holm, Mayor Pro tem

Council Members: Bobbi Bentz, Jim McKenna, Kelly Whiting, Kerry Walter-Ashby
Print
ORIGINATING DEPARTMENT: COUNCIL GOAL:
Public Works Responsible Growth and Revitalization
ACTION REQUESTED:
Resolution
LEGAL:
Item Reviewed by Legal Counsel
SUBJECT:
Proposed SW State Street and SW Prairie Trail Parkway Traffic Signal Improvements (PH 2019-31)
EXECUTIVE SUMMARY:

The SW State Street and SW Prairie Trail Parkway Traffic Signal Improvements includes reconstruction of left-turn lanes, intersection widening, sidewalk and crosswalk improvements, and traffic signalization.

 

The improvements include construction of approximately 205 CY of earthwork, 290 CY of imported topsoil, 352 SY of 8-inch and 1,339 SY of 9-inch PCC pavement, 249 SY of 9-inch colored and stamped PCC pavement, 319 SY of PCC sidewalk, 1,981 SF of sidewalk pavers, temporary street lighting, traffic signalization, granular subbase, subdrain and cleanouts, water main insulating, structure adjustments, pavement removal, landscaping removals, traffic control, pavement markings, erosion control, and miscellaneous associated work necessary to complete the project. The City will furnish combination signal / lighting poles and mast arms, for contractor installation.

 

The bid opening for the project was held on Tuesday April 9, 2019. Three (3) bids were received as follows:

 

1. Con-Struct, Inc.                      $ 795,000.00

2. Hawkeye Paving Corp.           $ 856,520.00

3. Absolute Concrete                  $ 966,542.50

 

 

The engineer's estimate for the project was $ 745,835.00. The bids range from approximately 7% to 30% above the engineer's estimate. Public Works staff reviewed the bid results internally and with Nilles Associates, Inc., the engineering firm that designed the project. It is recommended that the project be awarded to Con-Struct, Inc., of Ames, Iowa.

 

Pending project approval and award by the City Council, the contractor shall substantially complete the overall project within 60 working days. The early start date is June 3, 2019.

FISCAL IMPACT: No
This project is included in the City's current Capital Improvements Program with construction scheduled for 2019.
CITY MANAGER'S RECOMMENDATIONS:

It is recommended that the Council take the following action:

 

1. Hold a hearing on the proposed Contract Documents (plans, specifications, and form of contract) and estimated cost ($ 745,835.00).

 

2. Approve Resolution, adopting said plans, specifications, form of contract and estimated cost for the SW State Street and SW Prairie Trail Parkway Traffic Signal Improvements.

3.  Receive and file the report of bids received on April 9, 2019.

 

4. Approve Resolution, making award of construction contract to Con-Struct, Inc., of Ames, Iowa.

5. Approve Resolution, approving contract and bonds with Con-Struct, Inc. in the amount of  $ 795,000.00.

PREVIOUS COUNCIL/COMMISSION/BOARD ACTION(S):

March 18, 2019: The City Council approved a Resolution ordering construction and setting the public hearing date as April 15, 2019, in accordance with the Notice to Bidders and Notice of Public Hearing which was posted on the Iowa League of Cities and Master Builders of Iowa websites on March 22, 2019 and published in the Des Moines Register on March 29, 2019.

PUBLIC OUTREACH EFFORTS:
ACTION REQUESTED:

Action: Consider motion to:  1) adopt RESOLUTION adopting plans, specifications, form of contract, estimate of cost ($ 745,835.00); 2) receive and file report of bids received April 9, 2019; and 3) adopt RESOLUTION making award of construction contract with Con-Struct, Inc., of Ames, Iowa, in the amount of $ 795,000.00 for the SW State Street and SW Prairie Trail Parkway Traffic Signal Improvements.

Action: Consider motion to adopt RESOLUTION approving construction contract and bond with Con-Struct, Inc., of Ames, Iowa, in the amount of $795,000.00 for the SW State Street and SW Prairie Trail Parkway Traffic Signal Improvements.

ADDITIONAL INFORMATION:
ATTACHMENTS:
Click to download
RES - plans, specs
Bid Sheet
Bid Tabulation
RES - making award
RES - approving contract
Location Map